User Tools

Site Tools


multidisciplinary_integration_and_technical_support

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
multidisciplinary_integration_and_technical_support [2024/05/27 14:30] – [Result:] adminmultidisciplinary_integration_and_technical_support [2024/05/28 10:07] (current) admin
Line 8: Line 8:
 ===== Example 1: ===== ===== Example 1: =====
 ==== Situation/Task: ==== ==== Situation/Task: ====
-Tasked with building PCB test rigs for new generation beacons for Ocean Signal and ACR Group in Florida. Responsibilities included creating build notes for the jig, explaining all circuitry and modifications, generating a Bill of Materials (BOM) list, developing work instructions, and outlining debug guidelines for the product the tester was designed for.+  * Tasked with building PCB test rigs for new generation beacons for Ocean Signal and ACR Group in Florida. 
 +  * Responsibilities included creating build notes for the jig, explaining all circuitry and modifications, generating a Bill of Materials (BOM) list, developing work instructions, and outlining debug guidelines for the product the tester was designed for.
  
 ==== Action: ==== ==== Action: ====
-Reviewed provided schematics and PCB layout, rectified evident errors, and constructed four new PLB and EPIRB testers. Identified previously unseen issues during testing, including circuitry, test software, and mechanical problems. After the product launch, tasked with redesigning the EPIRB test jig to implement modifications and optimizations. Built an additional two jigs to meet demand.+  * Reviewed provided schematics and PCB layout, rectified evident errors, 
 +  * and constructed four new PLB and EPIRB testers.  
 +  * Identified previously unseen issues during testing, including circuitry, test software, and mechanical problems.  
 +  * After the product launch, tasked with redesigning the EPIRB test jig to implement modifications and optimizations. Built an additional two jigs to meet demand.
  
 ==== Result: ==== ==== Result: ====
Line 22: Line 26:
   * I traveled to Florida to train ACR's team, ensuring seamless integration and understanding of the new testing procedures.    * I traveled to Florida to train ACR's team, ensuring seamless integration and understanding of the new testing procedures. 
   * Additionally, I continue to serve as ACR's main support on these projects, providing ongoing technical assistance and troubleshooting expertise to ensure the continued reliability and performance of the PCB test rigs and associated products.   * Additionally, I continue to serve as ACR's main support on these projects, providing ongoing technical assistance and troubleshooting expertise to ensure the continued reliability and performance of the PCB test rigs and associated products.
 +
 +===== Example 2: =====
 +{{ :projects:os_wiki:s1.png?nolink }}
 +{{ :projects:os_wiki:s2.png?nolink }}
 +{{ :projects:os_wiki:s3.png?nolink }}
 +{{ :projects:os_wiki:s4.png?nolink }}
 +{{ :projects:os_wiki:s5.png?nolink }}
 +{{ :projects:os_wiki:s6.png?nolink }}
 +
multidisciplinary_integration_and_technical_support.1716820232.txt.gz · Last modified: 2024/05/27 14:30 by admin

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki